48-hour activation

Territorial Intelligence for Crisis Management and Business Continuity.

Emergency
Response

We support businesses, public authorities and emergency management teams in navigating the territorial impact of disasters and higly relevant events.

For the emergency meeting:

  • Leadership
  • Crisis management
  • Business Continuity
  • Supply Chain / Logistics
  • Security Teams
Activate response

We can be working within 48 hours of activation.

Settlement and river valley severely affected by a destructive debris flow

Know what matters now.

Through rapid territorial analysis, impact diagnostics and critical dependency assessments, we identify threats to operations, infrastructure, supply chain and essential services, translating critical situations into actionable intelligence and recovery priorities.

  1. What is interrupting your operations?

    We identify damaged facilities, infrastructure failures, restricted access, power outages and logistics bottelnecks affecting your operations.

  2. What is delaying disaster recovery?

    Public infrastructure damage, emergency restrictions and local recovery priorities can determine when operations resume. We analyse them to help decision-makers decide what can be restored and what needs coordinated action.

  3. How can you reduce downtime and accelerate restart?

    We assess and structure recovvery options, from alternative supply and access routes, temporary capacity and logistics workarounds.

Disruption underway? We can help.

Activate the urgent service. Initial assessment within 48 hours of activation.

Emergency activation

Get on the critical path.

When an event hits, restoring the site is only part of the problem. Roads may remain closed, utilities unavailable, suppliers unable to deliver, or public infrastructure may take weeks to recover. Terranova assesses how these constraints affects the site's connection to the wider territory, helping the team determine what to address and how.

01

Establish what is affected

Assessment of the current status of the site and the territorial connections it depends on: access routes, utilities, suppliers, etc. Each is recorded as Operational, partially operational, inoperative or not verified, based on the available information.

02

Identify what is blocking recovery

A damaged road does not necessarly stop operation. An unavailable acces route with no alternatives might. We identify which dependencies are critical to restarting and which constraints need to be solved first.

03

Assess viable alternatives

We examine possible alternatives where a critical connection is unavailable. Different routes, logistics facilities, temporary operating arrengements or relocations are part of the scope. The aim is to find ways to restart or mantain the activity running.

04

Account for public recovery

Some constraints can be addressed by the company. Others depend on infrastructure operators, public authorities or wider regional recovery. We distinguish between the two, assessing what is known and identifying the decisions that your team can take.

Swiss military bridge deployment restoring a disrupted transport corridor

What you get

Know when operations can restart — and where to deploy capital first.

You get the status of what is affected, still functioning or still unverified; the constraints, owners and timing on the critical path; and a sequenced set of actions for restoration, temporary continuity or relocation.

  • Disruption and dependency status — a structured view of affected, functioning and unverified dependencies, including the evidence behind each status.
  • Critical-path and recovery timeline — the constraints blocking recovery, the responsible parties, and the expected timing or conditions for resolution.
  • Prioritised recovery actions — a sequenced set of actions, with options and decision points for restoration, temporary continuity or relocation.

Separate what you can control from what depends on others.

Government and public organisations

What cannot be fixed directly. Roads, utilities and public works follow the region's recovery plan.

  • Public infrastructure restoration
  • Authority and operator timetables
  • Constraints that have to be waited on

Companies

What can be acted on now. This is where capital compresses downtime.

  • Alternative routes and suppliers
  • Temporary capacity and facilities
  • Repair, reroute or relocate

Plan against the recovery timeline.

The crisis team gets a schedule for each path — restore, continue around the site, or relocate — and commits only to the one the timeline can still support.

Stabilise & restore

Set the operations that can be restored within the expected recovery timeline. Whether a critical route being available again or the facility damage being solvable within the stablished time constraints.

Maintain operations through alternatives.

Where the site cannot restart in time, alternative routes, warehouses and temporary facilities are sequenced so the operation keeps running. The schedule sets what needs rearrengement, by when, and when can previous dynamics come back.

Relocate when recovery is not available.

If restore and temporary continuity both miss the time the business can afford, relocation is scheduled as a temporary or permanent move. It uses the same constraints, so the team can see the moment the current site should be left.

On-site option

Deploy a team to the affected site.

When remote intake is not enough, we can place a team on the ground to validate damage, access, utilities and the dependencies that still hold the operation.

  • Confirm what is hit — and what still runs — where the maps and calls leave gaps.
  • Read access, power, logistics and public works priorities in the field.
  • Feed the reactivation timelines with observed status, and local coordination.

Optional module. Activated with the response when local conditions require physical presence.

Discuss on-site deployment
Analytical team assessing conditions on the ground after a territorial disruption

Activate now — if any of this is true.

Just hit

Facility, access or a critical dependency has just been affected.

Operations down

The operation has stopped or is severely degraded, and the critical path is not yet visible.

Public wait

Public recovery will take time, and capital must be sequenced now.

Cannot wait

The next capital decision has to be taken now — not after a long study.

Settlement and river valley severely affected by a destructive debris flow

From the studies

The site can be intact. The operation still stops.

A facility sat above the modelled flood extent. Production stopped anyway: the access road, the substation and the logistics operators were on the valley floor. That is the critical path this response is built to read.

Read the study